The power plant utilizes a fall of 302 meters and is connected via a 1 km long 132 kV overhead line to the existing power line between Samnanger and Øystese.
For the 132 kV overhead line, WOPAS poles were used. It was designed by Jøsok Prosjekt and the contractor was ISE Entreprise AS.